DEVELOPMENT PERMIT
Gregg’s
Landing R.P.U.D. Development Permit
For
WHEREAS, on April 9,
1996, the Village of Vernon Hills (the “Village”) enacted Resolution No. 96-06
granting final R.P.U.D.Development Plan Approval, final site and Landscape
Approval, final Subdivision Plat Approval, and Final Resubdivision Plat
Approval (the “Resolution”) for the Gregg’s Landing Development of the Cuneo
Property (“Gregg’s Landing”); and
WHEREAS, the Resolution, in Section 2,
paragraph 5, sets forth the requirements for the issuance of a Development
Permit (“Development Standards’) for the development of individual pods within
Gregg’s Landing; and
WHEREAS, the Village Board has reviewed
the proposed single-family housing development of Pod E, and has taken into
account the recommendations of the Village Staff and Planning and Zoning
Commission.
In consideration of the
foregoing as set forth herein, the Village grants to Zale Companies a Final
Development Permit for Pod E, subject to the following conditions:
1.
The “WHEREAS” clauses set forth above are hereby incorporated as
part of the terms and conditions of this agreement.
2.
Zale Companies, the Developer of Pod E (the “Developer”) shall be
allowed to commence construction of the infrastructure of Pod E.
3.
Compliance
with the site (SP-1) and landscaping (LP-1 thru 3) plans prepared by Allen L.
Kracower & Associates, Inc. with a revision date 5-8-03 except as may be
amended by the Village Landscape Architect.
4.
Compliance
with the final plat of resubdivision and improvement plans prepared by Spaceco
with a revision date 5/9/03 except as may be amended by the Village Engineer.
5.
Compliance
with the Technical Review comments and responses from Zale Homes in the letter
dated April 25, 2003 and Allen L. Kracower & Associates, Inc. with a date
5/5/03.
6.
Conditions
of approval:
a)
The Developer is granted a variation from exterior material
requirements to allow the use of materials other than masonry products,
i.e. cedar siding, “Hardiplank” type cement siding and/or EFIS for the first
floor of all the models
b)
Group mailboxes shall be of uniform design and furnished and
installed by the US Post Office according to Department of public works and US
Postal Service specifications. The
developer will provide the concrete base, but the mailboxes are furnished and
installed by the Post Office.
c)
Chimneys located on the exterior of the building wall shall be
masonry. Interior flues shall be enclosed with architecturally appropriate
materials to the style and color of the building siding.
d)
The
20-foot front yard, 6-foot side yard and 30-foot rear yard setback requirements
are approved.
e)
The
FAR requirements as setforth in the Resolution 96-06 are waived.
f)
The
developer shall install light poles on the pedestrian path, benches, signposts
and gazebo consistent with the pictures attached in Exhibit A thru D. The gazebo shall be constructed of as much
maintenance free materials as possible.
g)
No
driveway access to Lakeview or Gregg’s Parkways shall be permitted for Lots 1 –
22.
h)
Staff
and developer review of lighting issue in alleys throughout the POD.
i)
The “Letter of Awareness” as attached in Exhibit E shall be signed
by the Zale Companies and buyers of the individual lots submitted to the
Village by Zale
Companies with each corresponding building permit application.
j)
The
developer shall work with the Village and Fire Department to insure appropriate
addressing and street naming is achieved to minimize confusion within the
POD.
k)
The Sales Trailer (LP-4) and Entrance Sign (LP-2) plan prepared by Allen L.
Kracower & Associates, Inc., with a revision date
of 1-28-03 and 5-08-03 except as may be amended by the Village Landscape
Architect, is hereby approved.
l)
Review and approval of the Village Attorney of the HOA documents.
m)
Residential
Chimney and Vent Enclosure, Flashing, & Spark Arrestor/Rain Cap
Specifications for Gregg’s Landing shall be provided as follows:
1.
All
chimneys and vents used for venting wood burning appliances or gas-fueled
fireplaces shall be enclosed in a chimney chase. Exterior finish materials
shall match or compliment the predominant exterior finish material of the
dwelling except as other provided for within this Agreement. All portions of
the venting system including termination spark arrestors and rain caps that
penetrate through the chimney chase shall be black in color.
2.
All
intake and exhaust vents used for venting water heaters, furnaces and similar
appliances that penetrate through the roof shall be installed at the minimum
height allowed by the manufacturer specifications. Ideally, vents shall be installed below the ridge of the roof so
the vent is not visible when viewed from the front property line. All portions of the venting system, including
termination rain caps, may remain their natural color when installed through
the roof.
3.
If
manufacturer specifications require an intake or exhaust vent to terminate more
than three feet above the roof, said vent shall be enclosed in a chimney chase.
All portions of the vents, including termination rain and spark arrestor caps
that penetrate a chimney chase shall be black in color. It is preferred that all intake or exhaust
vents are grouped within the same enclosure when more than one is present.
4. For framed chimney chases, the metal flashing that is placed on
the top of the chase and that extends two (2) to three (3) inches around all
sides, shall be copper-colored.
n)
Lot 69 – Due to the irregular shape and limited building area of this
lot, the Building Commissioner is authorized to approve a new dwelling design
as long as the architecture is in concert with approved models as specified in
this Development Permit.
o)
Lot
90 – A variance is granted that will allow the front porch of the B English
Cottage model to encroach into the required front yard up to 1.2 feet.
p)
F
Prairie Model – A “blanket” variance is granted for the overhangs (gutters
included) to encroach into the required yard up to thirty (30) inches.
q)
Compliance with the following building plans prepared by the
Bloodgood, Sharp and Buster, with a submittal dated of May 9, 2003 and
including front, side and rear elevations, as attached as Exhibit A, are
approved:
Plan A – Front Load Condition
·
Craftsman
Design
·
Shingle
Design
·
Southern
Classical Design
·
Art
and Crafts Design
Plan B – Rear Load Condition
·
Four
Square Design
·
Classical
Design
·
Tudor
Design
·
English
Cottage Design
Plan C– Front Load Condition
·
Victorian
Design
·
Georgian
Design
·
Tudor
Design
·
English
Manor Design
Plan D – Rear Load Condition
·
Farm
House Design
·
Colonial
Revival Design
·
French
Country Design
·
Tudor
Design
Plan E– Front Load Condition
·
Craftsman
Design
·
Colonial
Design
·
English
Cottage Design
·
Georgian
Design
Plan F – Rear Load Condition
·
Farmhouse
Design
·
Victorian
Design
·
Prairie
Design*
·
French
Country Design
Plan G – Rear Load Condition
·
Craftsman
Design
·
Southern
Classical Design
·
Art
and Crafts Design
·
Georgian
Design
Plan H– Front Load Condition
·
Shingle
Design
·
Federal
Design
7.
This Development Permit (“Permit”) was originally granted to Zale
Homes, Inc. (currently known as KB Home), on June 5, 2003 and amended on
December 2, 2003 subject to the terms and conditions contained herein. This Permit is not transferable to any
entity that is not wholly controlled by KB Home.
The Board of Trustees of the Village of Vernon Hills on December 2, 2003 has authorized the Village President to execute this Agreement.
Adopted by roll call vote as follows:
AYES:
NAYS:
ABSENT AND NOT VOTING:
____________________________
Roger L. Byrne
Village
President
PASSED:
APPROVED:
PUBLISHED IN PAMPHLET FORM:
ATTEST:
___________________________
Jeanne
M. Schwartz
Village Clerk
Exhibit ____
Oakmont
at Gregg’s Landing
Letter
of Awareness
Purchaser(s)
_____________________________
Lot
Number ______________________________
Property
Address __________________________
As
the future purchaser of the above referenced property, Zale Homes would like to
make you aware of
We
acknowledge that we have received and reviewed this Letter of Awareness. Based on the signatures below, I/we have
read and fully understand the items listed above.
Buyer___________________________
Buyer___________________________
Date____________________________
Acknowledgement
I,______________________,
being the Zale Homes Sales Representative who has worked with the buyers listed
above, do hereby acknowledge that I have fully reviewed this Letter of
Awareness with the Buyers.
Zale Homes Sales Representative ___________________________________